Summary
The speakers plan how to fix the muddy back yard/back of the shop area using stone, gravel, ballast, concrete, or resin. They discuss costs of gravel (about £60 per ton), hiring a roller/compactor for around £10-15 a day, buying one for £180-200, quotes for concrete/resin work, and using waste material from motorway construction. They also consider proper base preparation to avoid water pooling.